2015年7月21日星期二

API Gauges -API 5B;API 7-2 ROTARY THREAD GAUGES

Dear all  ,

This is Jeff from Shanghai Jingoo Petroleum Apparatus Co.,Ltd., China.
 We specialize in distributing API gauges and offering professional calibration services. Please see attachments for our catalogue, API licenses & ISO certificate of the manufacturer we represent.

Our company was founded in 2003 to represent the products of the top 2 API gauge manufacturers in China. Both of them are subsidiary facilities of state-owned corporations and are API-licensed. All our gauges come with third-party calibration certificates that are traceable to China National Institute of Metrology and valid for API audit.

We are serving 60% of the OCTG manufacturers and oilfield service companies in China, which include China National Petroleum Corporation, China Petrochemical Corporation, China National Offshore Oil Corporation, Wuxi Seamless Oil Pipes Company Limited, Weatherford China, etc.

The advantages we offer are as below:

Premium quality: Our gauges strictly meet the API specifications and are widely used by China National Petroleum Corporation and China Petrochemical Corporation.

Excellent price: Our company occupies 60% market share in China, we can offer best price to you.

Immediate delivery: We keep plentiful stocks for our regular type and size gauges. Once you place the order, we can arrange the delivery to you within 2 weeks.

Third-party calibration: For all the gauges you buy from us, we will offer third-party calibration that is traceable to NIST and valid for API audit.

If you have the chance to come to China, we would be very happy to receive you and show you around our facilities.

Look forward to hearing from you.
















NEWS:
Construction of Chinese part of the Eastern Route of Russia-China Gas Pipeline commenced
2015/06/30
On June 29, the commencement ceremony of the Chinese part of the Eastern Route of Russia-China Gas Pipeline was held simultaneously via video link in Beijing, Moscow and the construction site in Heihe, Heilongjiang province in China.This has brought the overall pipeline connecting the two countries under construction. Chinese Vice Premier Zhang Gaoli gave the order to commence construction from the Great Hall of the People in Beijing, Russian Prime Minister Dmitry Medvedev delivered a speech in Moscow, and CNPC Chairman Wang Yilin presided over the commencement ceremony.
The Chinese part of the Eastern Route of Russia-China Gas Pipeline will run from the China-Russian border in Heihe of Heilongjiang Province and end at Shanghai, passing through nine provinces and cities including Heilongjiang, Jilin, Inner Mongolia, Liaoning, Hebei, Tianjin, Shandong, Jiangsu, and Shanghai. A 3,170km-long pipeline and auxiliary underground gas storages will be built. And an existing 1,800km-long pipeline will be included. Construction of the Russian part of the pipeline, which the Russian side named the Power of Siberia, started on September 1, 2014.
On May 21, 2014, a gas purchase and sales contract via the eastern route pipeline was signed between CNPC and Gazprom. Under the 30-year contract, Gazprom will start transmitting gas to China via the Eastern Route from 2018, with gas delivery gradually increasing to 38 billion cubic meters per annum.
The imported gas will mainly supply China's Northeast, Beijing-Tianjin-Hebei area, and the Yangtze River Delta region, helping meet increasing clean energy demand, improve air quality, and optimize energy mix. The use of 38bcm of natural gas instead of coal will cut the emissions of CO2,SO2 and NOX by 163.78 million tons, 1.82 million tons and 0.46 million tons, respectively.

没有评论:

发表评论